Two layers of insulation was installed on the hull in the V-berth in the same manner as in the head. The front and side panels for the hanging locker were installed with a piece of Jatoba cut and routered to join the two panels. Several coats of Min Wax Wipe On Poly was applied to the panels before installation. Epoxy fillets were applied to the panel at the hull.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment