Monday, November 24, 2008

Epoxy Metering Pump

The shop bought a metering pump for west System Epoxy that pumps both the resin and hardener at the same time. I put it too use dispensing resin for my projects, making several batches and randomly testing the unit for accuracy by holding small graduated measuring cups under each spout to ensure it was dispensing at the correct ratio. I am very impressed by this unit and wish we'd have bought one sooner. It is simple to use and a great time saver and is very accurate.




Holding Tank

With no good choice available for a drop in pre-made holding tank I decided to incorporate one into the hull. After the new ballast cap was laid up (with three layers of biaxial cloth) three layers of biaxial cloth was applied to the hull forming the tank sides. The top and baffle was templated in the usual manner and the parts laid up in the shop and then trimmed to fit. The baffle and the tank fittings were installed, then the top was glassed into place using three layers of biaxial cloth on all seams. West System epoxy was used for the project and the mixture was made slightly resin rich as recommended by West system when building tanks.



Thursday, August 28, 2008

Moving the boat to the shop

This is our busy time of year at the shop so I have not had the time to post as often as I'd like.
A lot has been done since my last post. I'll add more pictures soon as time permits.
The hull stiffeners are completed. Three layers of biaxial cloth was glassed over the ballast pig forming a new cap and an 18 gallon holding tank was glassed into the hull.
The prop shaft, stuffing box and stern tube were removed and the old glass ground out and three layers of biaxial glass was applied.
The aft (cabin) bulkheads were installed as were the partitions in the lazzerette and under the cockpit. The floor partitions were installed and a temporary floor put down.
A customer who had the same little diesel as I salvaged out of the O'day made me an offer I could not refuse and bought the diesel from me. His was not repairable and mine was a drop in replacement for it. I purchased an electric motor, controller, etc and will be putting them into the vessel this winter.
Last week we moved the vessel from the back yard of my home to the shop where I work and it will be stored inside a heated building for the winter so I can continue the project during the cold weather. Last winter we had several trees come down, some uncomfortably close to the vessel, I am grateful to my boss and good friend Gary Dawes for letting me bring the vessel to the shop for the winter! He says he likes the fact that I can't call in sick to work on my boat anymore! :-)

Placing the yard arm jacks

Nick (foreground) and Scott our professional boat movers chaining up for the lift. Thanks for doing a great job on the move! You guys are the best!


Going up!


Backing the trailer under the cradle


The cradle was custom built to fit the trailer


Lowering onto the trailer


On the way to the shop


At her new home in the south building at the shop


Framing a wall around the boat.

Installing a door.

Walled in.


Monday, June 2, 2008

Aft Head bulkhead


The aft head bulkhead went together very easily. It was trimmed to fit, several coats of Minwax Wipe-on poly was applied and it was tacked into place and then filleted and glassed with three layers of biaxial glass.